Connecticut Town to Convert 2,358 Streetlights to LED

Town council members from Berlin located in Connecticut, U.S. has approved a US $ 1.48 million contract to swap 2,538 streetlights with LEDs , reported Hartford Courant.

The payback period of the lighting project is expected to take less than four years, and is part of an $8.77 million energy conservation plan the town approved earlier this month with project contractor NORESCO, a United Technologies subsidiary.

Financing approved for the projects will be used for the streetlight conversion.

Town Manager Denise McNair pointed out the figures and estimations submitted to the council Tuesday were the result of a streetlight audit the town authorized in April to determine the cost, maintenance, savings and other factors.

The proposed plan will give streetlight ownership to the town, and the contract includes maintenance and upkeep for the poles and fixtures.

Savings in streetlight energy bills will be part of the overall energy savings made through conservation and upgrades that will pay the entire cost of the NORESCO project.

Tank Streetlighting of San Francisco is the vendor for the job. The council has passed the contract, and at a meeting on Tuesday council members requested the extent of the LED lighting upgrade to include the town’s athletic playing fields. A price for the additional work will be given to the council at a later meeting.

The LED streetlights are expected to reduce 75% of energy usage than high pressure sodium bulbs. The town’s annual street-lighting electricity bill will be slashed from $391,539 to $49,247, generating a first year savings of $342,292.

Through a 20-year period, the streetlights are estimated to save $7.54 million in energy costs. The 20-year estimate for usage of high pressure sodium bulbs will be lowered to $8.62 million and costs for more efficient LED fixtures will be at about $ 1.08 million.

Disclaimers of Warranties
1. The website does not warrant the following:
1.1 The services from the website meets your requirement;
1.2 The accuracy, completeness, or timeliness of the service;
1.3 The accuracy, reliability of conclusions drawn from using the service;
1.4 The accuracy, completeness, or timeliness, or security of any information that you download from the website
2. The services provided by the website is intended for your reference only. The website shall be not be responsible for investment decisions, damages, or other losses resulting from use of the website or the information contained therein<
Proprietary Rights
You may not reproduce, modify, create derivative works from, display, perform, publish, distribute, disseminate, broadcast or circulate to any third party, any materials contained on the services without the express prior written consent of the website or its legal owner.

JBD, a pioneering MicroLED display manufacturer, has set a new standard with its Phoenix series microdisplay, achieving an industry-record white-balanced brightness of 2 million nits. JBD’s Phoenix - Native Monolithic RGB Panel Leveragin... READ MORE

Veeco Instruments Inc. today announced that PlayNitride, an industry leader in MicroLED technology, has qualified Veeco’s Lumina® MOCVD system for production of next-generation MicroLEDs, and also placed an order for two systems for ... READ MORE